HB Environmental Engineers, Inc., also
designs, supplies and supervises the installation of packaged
sewage treatment plants for camps, residential compounds,
hotels and other small communities. Population served is up
to 5,000 people.
Our packaged sewage treatment plants are of prefabricated
steel or fiberglass construction. We also supply all the equipment
necessary for in-place concrete tankage.
There are basically four compartments or chambers in a sewage
treatment plant: aeration, settling, aerated sludge holding
and chlorine contact chambers. The internal equipment consist
of galvanized steel piping, air diffusers, duplex air blowers,
submersible pumps and chlorination equipment. A control panel
is also supplied and installed on the blower housing (see
picture below).
Delivery period for the internal equipment to be installed
on site is about 4-5 weeks ex-works. We can ship thse equipment
all over the world in a 20 or 40 ft container. Of course a
set of 'as built' drawings are also provided.
 |
 |
|
Package
Extended Aeration Sewage Treatment Plant .
|
|
|
Duplex
Air Blowers in an Acoustic Enclosure with Control
Panel.
|
|